How should the small concrete mixing plant be properly adjusted?

Small concrete mixing plant is widely used in highway construction, bridge, power station, dam construction and other field construction projects. At the same time, it can also be customized according to the special requirements of users, so as to meet the needs of users. So when the concrete mixing plant is installed, the equipment should be debugged. The problem is coming. How to debug correctly?

mobile concrete batching plant

When adjusting the control system, the emergency button is reset first and the power switch in the electric cabinet is closed. After connecting, the circuit breaker, the control circuit power switch and the control room power switch are closed in turn. If there is any abnormal phenomenon in the electrical system, if there is an immediate check, open the buttons of each motor and try to run the steering of the motor. If it is correct, if it is not correct, it should be adjusted immediately; start up the gas pump of the concrete mixing plant , start the air control door according to the button after the pressure is reached, check whether the action is flexible, adjust the zero and adjust the sensitivity of the microcomputer; check the switch of the air compressor is normal, the pressure meter shows whether the pressure meter is correct, it will be safe The pressure adjustment of the valve should be standard range; test the mixer to see if there is any abnormal noise and whether each component can work properly; it needs to run when debugging the belt, check the flexibility of the various rollers during the operation and carefully observe the belt, so that there is no swaying, running, grinding, skidding. When the concrete batching machine is debugged, the batching button must be pressed to see if it is flexible and the precision can be configured, and then the reference of the ingredients is adjusted.