The method of keep good working condition of concrete mixing plant

Users who use concrete mixing plant believe that many of them can do routine maintenance work, but few people know that in the concrete mixer, the flow of oil directly determines the concrete mixer is running well.
In the production process of the concrete mixer, the oil circuit can be set to insert the valve and connected to the solenoid valve of the plug, the valve plug valve and the solenoid valve branch circuit composed of the speed control valve in parallel it can ensure that large flow of hydraulic oil through the shunt.

Continue Reading →